<\/figure><\/div>\n\n\nUnloading Time<\/h2>\n\n\n\n Concrete is one of the strongest construction materials around, but it has to dry gradually in order to reach its full strength. This process is called hydration, and it begins the moment you start mixing water into the concrete mix. You may be able to speed up this process by fogging the concrete, or hooking it up to a sprinkler, but you will still need to allow enough time for the hydration to occur before it\u2019s ready to pour.<\/p>\n\n\n\n
In the average conditions, concrete takes 48 hours to harden enough to walk on, a week for it to be safe for vehicles to drive on, and 28 days to reach its full strength. This is based on the typical water-to-cement ratio, temperature, and relative humidity of the area where the concrete is being placed.<\/p>\n\n\n\n
When you\u2019re estimating how much concrete you need for your project, make sure to include all labor and overhead costs. This includes the labor needed to prepare, transport, place, compact, and finish the concrete, but also the cost of tools such as shovels, rakes, trowels, and screed boards. In addition, don\u2019t forget to factor in overhead expenses such as vehicle maintenance and fuel, office supplies, and advertising.<\/p>\n\n\n\n
Developing an accurate concrete estimate can be difficult, but it\u2019s important to get it right. Otherwise, you could waste money by ordering more concrete than you need, or experience scheduling delays as you wait for additional concrete to be delivered.<\/p>\n\n\n\n
Delivery Time<\/h2>\n\n\n\n Concrete is an essential building material that is used in everything from foundations to structures and pre-cast and cast-in-place panels. Because of its importance, it is crucial to understand how long a project will take and how you can ensure that your contractor is on time and has enough material to finish the job.<\/p>\n\n\n\n
During your initial conversation with your concrete contractor, you should ask for an estimate of how long it will take to complete the project and what steps they will take to achieve this goal. They should also provide you with examples of their previous work that match your style preferences and project requirements.<\/p>\n\n\n\n
It is also important to find out if the contractor will need to obtain permits for your concrete project and how long this will take. Once you have this information, you can factor it into your labor costs when creating a concrete takeoff and avoid any surprises later on in the project.<\/p>\n\n\n\n
It is also good to find out how much work an average worker can do in one day and to factor this into your labor costs. This will help you avoid overpaying for labour and allow you to create a budget that includes all the necessary materials and time to complete your concrete project. Additionally, it is always a good idea to ask your concrete dispatcher what the maximum delivery volume is for your order and what the minimum order amount is.<\/p>\n","protected":false},"excerpt":{"rendered":"
Many questions are asked about concrete process times and how long it takes before your project is ready to use. The 28-day stipulation has become an industry standard, but it isn\u2019t necessarily accurate. Concrete reaches 70% of its specified compressive strength within one week and should be safe to walk on after that. It is important to keep the concrete…<\/p>\n
Read More Read More<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3],"tags":[],"_links":{"self":[{"href":"https:\/\/www.tycowater.com.au\/wp-json\/wp\/v2\/posts\/109"}],"collection":[{"href":"https:\/\/www.tycowater.com.au\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.tycowater.com.au\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.tycowater.com.au\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.tycowater.com.au\/wp-json\/wp\/v2\/comments?post=109"}],"version-history":[{"count":2,"href":"https:\/\/www.tycowater.com.au\/wp-json\/wp\/v2\/posts\/109\/revisions"}],"predecessor-version":[{"id":114,"href":"https:\/\/www.tycowater.com.au\/wp-json\/wp\/v2\/posts\/109\/revisions\/114"}],"wp:attachment":[{"href":"https:\/\/www.tycowater.com.au\/wp-json\/wp\/v2\/media?parent=109"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.tycowater.com.au\/wp-json\/wp\/v2\/categories?post=109"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.tycowater.com.au\/wp-json\/wp\/v2\/tags?post=109"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}